The installation of the wind tower: determine the anchor point and base plate point of the base, then screw in the ground anchor and dig the pit. In case of poor soil quality, the key points of concrete pouring shall be used for pit excavation.
Next is the base plate and pipe fittings, which are reinforced with "L" iron bars. There are some winch devices. The wind tower lies in the opposite direction, 9.1 meters away from the base plate. How much 12V battery is needed for the winch. Before the tower tube installation, the lubricating grease shall be coated at the joint, and the joint shall be tamped with a sledge hammer to prevent the deflection of the wind vane when the tower tube is erected.
Raise the anemometer tower. When starting to raise the anemometer tower, the top of the guide rod should be tightened by the personnel at both ends with ropes and kept straight. Raise the anemometer slowly, keep the guide rod straight and do not shake it. The winch drags the top of the guide rod, and all the cables at the 5 points of the wind tower are firmly fastened to the top of the guide rod. Secure the cable with the ground anchor with the wire clamp. Three wire clamps shall be used for each cable, with a distance of 20mm.
Raise the anemometer tower. When starting to raise the anemometer tower, the top of the guide rod should be tightened by the personnel at both ends with ropes and kept straight. Raise the anemometer slowly, keep the guide rod straight and do not shake it. The winch drags the top of the guide rod, and all the cables at the 5 points of the wind tower are firmly fastened to the top of the guide rod. Secure the cable with the ground anchor with the wire clamp. Three wire clamps shall be used for each cable, with a distance of 20mm.
At the sensor 40M of the wind tower: 1 anemometer; 1 wind vane (with a lightning rod). 1 anemometer at 30M, 1 anemometer at 10M.
For the sake of tranquility, the recorder is installed at a certain height. The lead wire of the sensor and the copper lead of the lightning rod must be rotated downward around the tower drum, and the end is connected with the recorder and a copper bar passing through the base plate.