1. Foundation construction

Foundation construction is the basic link in the construction of steel pipe towers. Its stability is directly related to the overall stability and durability of the tower. Therefore, during the construction process, the design drawings and industry standards must be strictly followed, the appropriate foundation type must be selected, and the ground must be leveled and compacted. In addition, foundation pits need to be excavated and various reinforcements accurately arranged to ensure the stability and reliability of the foundation.




2. Tower manufacturing

As the main structure of the steel pipe tower, the quality of the tower tube has a decisive impact on the load-bearing capacity and service life of the entire tower. When manufacturing the tower, high-quality steel plates should be selected strictly according to the design drawings and technical specifications, appropriate welding processes should be adopted, and strict quality inspection should be carried out. In addition, in order to prevent the tower from corrosion and oxidation, anti-corrosion treatment and surface painting are required.




3. Tower assembly

Tower assembly is a key link in the construction of steel pipe towers, which mainly includes tower hoisting and welding work. During the hoisting process, it is necessary to select suitable lifting equipment and spreaders, and conduct accurate calculation and testing of lifting points to ensure the safety and smoothness of the hoisting process. During the welding process, appropriate welding processes and materials should be selected and subjected to strict quality inspection to ensure that the welding quality meets relevant standards.




4. Tower top installation

Tower top installation is the last and most critical step in the construction of steel pipe towers. During the installation process, it is necessary to select appropriate lifting equipment and spreaders, and conduct accurate calculation and testing of lifting points to ensure the safety and stability of the tower top installation. At the same time, necessary fixing and anti-tipping measures must be taken to ensure the overall stability and safety of the tower.